TY_MEDICAL_CONSUMABLES_AND_LAB
TY_MEDICAL_CONSUMABLES_AND_LAB

Lianggong Formwork Company Showcases Advanced Solutions in BNI Bank Building Project, Wins Prestigious Award

Jakarta, Indonesia – In a landmark collaboration between PT PP (Persero) Tbk and Bank Negara Indonesia (BNI), the BNI Bank Building Project has set new standards in modern construction, earning widespread acclaim for its innovative use of advanced formwork systems. Lianggong Formwork Company played a pivotal role in this prestigious development, implementing cutting-edge solutions that have not only elevated construction excellence but also secured the project a highly coveted award from the Indonesian government.


climbing formwork systems


The BNI Bank Building Project, a state-of-the-art facility located in a strategic location in Indonesia, represents a significant milestone in the country's financial infrastructure. Designed to integrate functionality with contemporary architecture, the project demanded precision, safety, and efficiency in its construction process. Lianggong Formwork Company rose to the occasion by deploying a suite of advanced formwork systems tailored to meet the project's unique requirements.


Project Overview

Project Name

BNI Bank Building Project

Location

Strategic location in Indonesia

Scale

State-of-the-art bank building

Completion Time

Ahead of schedule

Awards Received

Prestigious award from Indonesian government


Innovative Formwork Systems in Action

Lianggong Formwork Company utilized a range of advanced formwork systems to achieve the project's goals. Below is a detailed breakdown of the systems employed and their respective advantages:

System Name

Advantages

Application Stage

H20 Timber 

Beam Wall 

Formwork

Enhanced load-bearing capacity, superior structural integrity, faster installation

Foundation 

and core structure

H20 Timber 

Beam Column 

Formwork

Quick-release mechanisms, integrated safety platforms, precision alignment

Column construction

Flex-Slab Formwork

Adaptable to varying floor layouts, efficient installation, consistent quality

Floor systems

Cantilever Climbing 

Formwork

Advanced safety features, streamlined climbing process, optimal external access

External works


Key Achievements

The BNI Bank Building Project achieved remarkable milestones, setting new benchmarks in construction excellence:


Achievement Area

Results

Safety Performance

Outstanding safety record with zero major incidents and 100% protocol compliance

Quality Standards

Exceeded industry benchmarks, zero-defect rate in wall systems

Timeline Adherence

Major milestones completed ahead of schedule

Technical Excellence

Seamless integration of advanced formwork systems


Project Milestones and Savings

The project's success is further highlighted by its impressive milestones and cost-saving measures:

Milestone

Completion Status

Time Saved

Cost Saved

Core Structure Completion

Ahead of schedule

15%

20%

Wall Systems Installation

Zero-defect achieved

10%

15%

Column Installation

Perfect alignment

20%

25%

External Works Completion

Safe and efficient

12%

18%


Quality Control and Safety Measures

The project's unwavering commitment to quality and safety is evident in the following measures:

Quality Control Aspect

Frequency

Outcome

Formwork Installation Verification

Daily

Zero defects in wall systems

Column Alignment Checks

Per installation

Perfect structural integrity

Floor Level Inspections

Pre-pour

Consistent quality output

Safety Lock Monitoring

Each climb

Zero incidents during construction


Awards and Recognition

The exceptional performance of Lianggong Formwork Company in the BNI Bank Building Project was recognized with a prestigious award from the Indonesian government. This accolade underscores the company's commitment to innovation, quality, and safety in construction. The project's success also highlights the importance of selecting appropriate construction technologies for complex commercial developments.


Client Satisfaction and Legacy

The BNI Bank Building Project has not only delivered a state-of-the-art facility but also established a benchmark for future construction projects in Indonesia. The collaboration between PT PP (Persero) Tbk and BNI, supported by Lianggong Formwork Company's innovative solutions, has resulted in a structure that exemplifies both functional excellence and aesthetic appeal.


"We are thrilled to have contributed to such a transformative project," said a representative from Lianggong Formwork Company. "The BNI Bank Building Project is a testament to the power of advanced formwork solutions in achieving construction excellence. We are honored to receive this award and look forward to continuing our commitment to innovation and quality in the construction industry."


This groundbreaking project serves as a testament to the capabilities of innovative formwork solutions in contemporary architecture. Its success highlights the importance of selecting appropriate construction technologies for complex commercial developments, setting a new standard for excellence in Indonesia and beyond.