Core Tube Structures & Towers Formwork

Experts in the production of scaffolding and formwork, Lianggong Formwork uses prefabricated formwork systems that are easy to install and disassemble on location. The novel technique has revolutionized the building of towers and core tube structures in China. Lianggong formwork technologies have been used in numerous historic projects, allowing for unprecedented advancements.

Techniques for Building Core Tube Structures

Modular 3D cage solutions for core tubes are made possible by the Lianggong formwork technology. Around the center, big prefabricated cage modules are lifted and put together layer by layer. They speed up cycle times, cut waste, and offer enclosed working areas. This approach was used by the Shanghai Tower core tube, which completed more than 800 meters in under 8 years. Some excellent choices for building the core tube structure's vertical space are as follows:

Lianggong climbing formwork system with cantilevers. The prefabricated formwork components used in this system are easily constructed and disassembled on location. Because the parts may be lifted and assembled layer by layer, it works well with core tubes. Several notable core tube constructions in China, including Guangzhou CTF Finance Center and Shanghai Tower, have made use of Lianggong formwork.

The hydraulic auto-climbing formwork system by Lianggong. The hydraulic lifting mechanism of this device is capable of climbing on its own. It can increase durability and expedite construction even further. Lianggong Hydraulic Auto-Climbing Formwork has been employed in some of Asia's highest structures.

A system of formwork made of aluminum alloy. This makes use of lightweight aluminum alloy components, which can boost lifting efficiency and drastically reduce weight. This technique is more advantageous for projects with larger loads or at higher elevations. Aluminum alloy formwork has been used in some cores for environmentally friendly construction.

Formwork tunneling system. The core tube is partially enclosed by large prefabricated tunnel components. Construction is done inside the tunnel, where circumstances are safer and weather protection is provided. By reducing the need for scaffolding and site enclosure, this technology speeds up development. It has been used in numerous historic projects.

Three-dimensional system of modular forms. The core tube is surrounded by large prefabricated cage or box modules that are lifted and assembled in three dimensions. At higher floors, they can then be disassembled and reassembled. This creative system makes it possible to build the vertical space quickly, cheaply, and reusable. Shanghai Tower is one project that has shown its potential.

Tower Construction Solutions

Helical ramp solutions for towers are also made possible by Lianggong. The tower is encircled by prefabricated ramps that enable quick, high-speed hoisting. Compared to traditional staircases, this is more cost-effective, safe, and efficient. Helical ramps were used in the Wuhan Center and Guangzhou CTF Finance Center to reduce hoisting obstruction and expedite progress.

Strive to transform tower and core tube structural solutions.

Lianggong Formwork has the potential to transform core tube structure and super-tall tower solutions both domestically and internationally with further innovation. Construction speed, quality, safety, affordability, and environmental performance can all be further enhanced by new ideas. In the upcoming years, Lianggong Formwork will probably make it possible for even more innovative ideas.

In conclusion, Lianggong formwork has produced tunnel forms, helical ramps, folding platforms, modular three-dimensional cage forms, and more for towers and core tube structures. These creative ideas are redefining possibilities and revolutionizing the building of such intricate undertakings.


Core Tube Structures & Towers Projects

Lianggong Formwork Company has revolutionized the construction of core tube structures and towers in recent years. Many recent landmark projects in China have utilized Lianggong formwork systems, including the Shanghai Tower, Guangzhou CTF Finance Centre, Suzhou Zhongnan Center, and Wuhan Center. These super-tall buildings and towers were constructed in record time using Lianggong formwork systems. For example, the Shanghai Tower was completed in just 8 years, saving one year from the original schedule. The Guangzhou CTF Finance Centre's core was completed in just 3 years, significantly faster than traditional construction methods.

The key advantages of lianggong formwork include:

  • Speed and efficiency. The prefabricated components can be assembled and disassembled rapidly on site without complex carpenter work. This accelerates the formwork cycles and overall construction progress.

  • Improved quality. The standardized components ensure high consistency in size, shape, strength and other parameters. This results in a high-quality finished product with minimal defects.

  • Reduced cost. Using prefab components saves time, materials, labor and equipment costs compared to traditional site-cast formwork. The faster construction also reduces interest costs.

  • Safety. The system reduces work at heights and the amount of scaffolding required, lowering safety risks for construction workers.

  • Environmental friendliness. The system reduces waste and minimizes the carbon footprint of projects by completing construction more efficiently and with fewer resources.

Lianggong formwork has revolutionized hoisting and construction of super-tall buildings in China. As more contractors adopt this innovative system, Lianggong is expected to continue enabling rapid and high-quality development of core tube structures and towers all over the world.